Pay for essential glazing works in instalments instead of funding the full project upfront.
Glass Upgrade Energy Saving Model
Commercial glazing performance model
Save Energy Charges through Upgrading Your Glass.
Have you considered upgrading your commercial glazing?
Modern, high-performance glass can refresh your building’s appearance, improve comfort for occupants and help reduce energy costs. Better insulation and solar control can also support more consistent internal temperatures.
Our Commercial Glazing Energy-Saving Calculator provides an indicative annual saving range in three simple steps:
- Tell Us About Your Current Glazing Select the glazing type, enter the approximate area and confirm whether the building is air-conditioned.
- Choose Your Glass Upgrade Compare your existing glazing with high-performance solar-control glass.
- Get Your Results View your indicative annual energy-saving range and explore the potential benefits.
Your result provides a practical starting point for discussing the most suitable glazing upgrade with Dortech Maintenance.
Tell Us About your Current Glazing
Choose your Glass Upgrade
Choose your desired Glass Specification:
Performance values are shown from the selected manufacturer glass specification and are used by the indicative savings model. Guardian and Pilkington options are nearest public-data equivalents and should be checked against the final project make-up. Clayton Glass Triple28 uses the supplied PDF’s 0.8 W/m?K U-value; its LT and g-value are conservative placeholders until EN 410 optical data is confirmed.
Advanced methodology assumptions — review before relying on the result
These values materially change the saving. Defaults keep the early-stage model usable when project data is unavailable; they are not surveyed facts or guaranteed UK-standard values. Replace them with project-specific evidence wherever possible.
Reference method: fabric heat saving uses ΔU × degree days × 24/1000. Cooling uses incident solar energy × Δg × cooling coincidence ÷ SSEER. UK government methodology confirms degree days are used with heat-loss coefficients; formal solar calculations require surface irradiance, g-value, orientation and shading. UK heat-demand method · GOV.UK solar-gain method · PVGIS site irradiance.
Selected scenario output
| Scenario | Area | Heating saving | Cooling saving | Potential annual saving |
|---|---|---|---|---|
| Clear Double Glazing Air Filled Cavity to Saint-Gobain COOL-LITE SKN 176 | 250m2 | GBP 0 | GBP 0 | GBP 0 |
The model will update automatically as inputs change.
The annual result uses the visible advanced methodology assumptions and is not a formal building simulation. Replace placeholder inputs with survey, weather, orientation, shading, plant and tariff evidence before an investment decision.
Highest saving glass options for this scenario
Contact Dortech Maintenance to talk through your existing glazing, building use, access requirements and the potential benefits of a modern glass upgrade.
Speak to our team now!Dortech glazing case studies
Advanced projection, methodology and finance details
Energy price trend and projected saving
This graph uses recent UK non-domestic gas and electricity prices as historic context, then applies a compound energy-price movement to the current calculator estimate. It helps show why a year-one saving may not remain flat if energy costs rise over time.
Historic energy-price context uses DESNZ Table 3.4.1 annual UK non-domestic prices, excluding Climate Change Levy. Future years are an illustrative compound projection from the calculator tariff inputs, not an official forecast. Source: DESNZ non-domestic energy prices.
| Year | Projected Saving (Midpoint) | Cumulative Projected Savings | Discount Factor | Present Value |
|---|
If the existing glass, heating efficiency, degree days, façade irradiance, orientation, shading, cooling controls or SSEER have not been verified, the result should be described only as an early-stage scenario. The PDF audit records every active assumption so it can be challenged and replaced with project evidence.
Model assumptions and evidence register
Use the status labels below to distinguish what came from the customer, what came from a manufacturer or public reference, and what Dortech has assumed to keep the early-stage model operable.
View the full assumption register, reasoning and evidence status
| Item | Status | Default / method | Reasoning and required validation |
|---|---|---|---|
| Existing centre-pane Ug and g-value | Dortech assumption with reference point | Category-specific typical values | Used when the existing unit has not been identified. A local-authority retrofit guide gives indicative Ug reference ranges including single glazing 5–5.6, air-filled double glazing 2.8, argon-filled double glazing 2.6 and air-filled low-E double glazing 1.8W/m²K; the model’s existing g-values remain Dortech assumptions. Confirm from markings, records, glass analysis or survey. Reference values. |
| Proposed Ug, light transmission and g-value | Published input | Selected manufacturer reference make-up | EN 673 / EN 410 centre-pane data. Recalculate for the final pane thicknesses, laminate, coating surface, cavity, gas fill and inner pane. Reference families: Saint-Gobain SKN, Guardian SunGuard, Pilkington Suncool. |
| Cavity Ug adjustment | Dortech assumption | Interpolated allowance from 6–24mm; 16–18mm = no uplift | Convenience adjustment only. It is not a substitute for the manufacturer’s whole make-up calculation. |
| Heating degree days | User-editable assumption | 2,000K·days/year | Generic starting point using the degree-day heat-loss method. Replace with the building’s region, base temperature and operating schedule. Met Office / UKCP reference. |
| Heating system efficiency | User-editable assumption | 85% seasonal efficiency | Reference point only, not a surveyed plant value. Approved Document L says to prefer ETL/PCDB, manufacturer or boiler-plate evidence, then suitable SBEM defaults. Approved Document L, Appendix E. |
| Warm-edge spacer allowance | Dortech assumption | 3% heating-side uplift | Placeholder for edge effects only. Validate using frame geometry, perimeter, linear thermal transmittance (Psi) and whole-window/curtain-wall calculation. |
| Effective annual solar irradiation | User-editable assumption | 552kWh/m²/year | Calibrated effective façade exposure selected to reproduce the legacy Dortech clear-to-SKN176 £2.70/£7.30 range because the model does not ask for location, orientation or shading. It is not a UK standard value. Replace with project-specific in-plane irradiance, for example from PVGIS or an approved hourly model. |
| Cooling coincidence / utilisation | User-editable assumption | 25% low case; 45% high case | Represents how much of the reduced transmitted solar gain coincides with occupied hours and an active cooling demand. No occupancy, control or shading schedule is collected, so this remains a Dortech scenario assumption. |
| Cooling seasonal efficiency | User-editable assumption | SSEER 3.0 low case; 2.0 high case | Cooling electricity is cooling load divided by SSEER. Replace with actual plant data; system type, part-load performance, fans and controls can materially change the result. |
| Energy tariffs | User input | Defaults: gas 5.065p/kWh; electricity 23.064p/kWh | Convenience defaults based on supplied 2026 quote data, not guaranteed current market rates. Replace with the customer’s invoice rates and account for taxes/levies consistently. |
| Five-year energy-price movement | User-editable assumption | 5% gas and 5% electricity per year | Illustrative compound escalation, not an official forecast. Historic DESNZ prices are context only. |
| Discount rate | User-editable assumption | 5% discount rate | NPV discounts projected midpoint savings then subtracts the entered project cost. It does not include tax, maintenance, degradation, residual value or financing. |
Formal-assessment boundary: EN 410 determines glazing solar/light characteristics; it does not by itself calculate annual building cooling savings. A formal assessment should use project geometry, orientation, shading, weather, occupancy, controls, internal gains and system performance in a method such as ISO 52016/SBEM or an appropriate dynamic simulation. ISO 52016-1 scope.
Optional business finance
Do you want to finance your reglazing project?
Click YES to view indicative finance calculations, Hexa Finance information and the dedicated PDF report.
Flexible business finance with
Spread the cost of a commercial reglazing project through an indicative business lease illustration supplied by Hexa Finance. Finance may help preserve working capital, create fixed payments and reduce the barrier of a large upfront project cost.
Preserve cash for other business priorities while progressing important facade improvements.
Indicative rentals are fixed across the selected term, subject to formal approval and documentation.
Hexa works across leases, rentals, hire purchase and business loans through its lender network.
Strong-credit applications may receive rapid decisions; more complex proposals can take longer.
Hexa and Dortech are partnered together to provide customer support.
A straightforward route to funding
How the process works
- 1You refer
Dortech provides the project, amount and customer details with the customer’s consent.
- 2Hexa assesses
Hexa reviews the customer and approaches a suitable funder from its lender network.
- 3Documents are signed
Following approval, the finance documents are completed and the glazing project can progress.
- 4Finance pays
For asset finance the funder normally pays Dortech directly; for a loan the customer receives the funds and arranges payment.
Indicative lease illustration
See how your project cost could be spread
Enter a project cost above to calculate indicative monthly rentals.
| Term | Indicative monthly rental | Sum of rentals |
|---|---|---|
| Enter the reglazing project cost to calculate the finance illustration. | ||
How this illustration is calculated: the supplied Hexa template finances 105% of the project cost and uses an indicative 21% annual rate for 12 months and 18% for 24-84 months, with rentals paid in advance.
Important: these figures are illustrative only and are not an offer of finance, financial advice or a guaranteed quotation. Rates, products, tax treatment, approval, security and documentation are subject to the applicant, funder and current rules. Please confirm any tax treatment with your accountant. Projects over £50,000 require a bespoke Hexa quotation.
Smarter lending solutions for business
Would you like to explore finance?
Hexa Finance can assess asset finance or business-loan options for eligible UK businesses.
Questions and answers
Reglazing finance FAQ
These answers summarise the information supplied by Hexa Finance for the proposed Dortech referral arrangement.
How much funding can Hexa provide, and is there a minimum or maximum facility size?
What security requirements might apply?
What are the typical approval timescales?
What documents might a customer need to provide?
Does Hexa have relevant case studies?
Hexa Finance Limited is authorised and regulated by the Financial Conduct Authority as a credit broker, not a lender – Firm Reference Number 974633. Finance is available to eligible business applicants only and is subject to status, credit checks, lender approval, documentation and terms.
Hexa Finance Limited, Wentwood House, Langstone Business Village, Newport, NP18 2HJ. Company Registration No. 12814502.



