White Rose Park ABC Building



Dortech Maintenance Case Study

White Rose Park ABC Building

Improving aesthetics, tenant comfort and energy performance through specialist reglazing at White Rose Park in Leeds.

White Rose Park ABC Building

ClientMunroe K
LocationWhite Rose Park, Leeds
Design teamThink Architecture Ltd
Existing systemMAG Presslock Curtain Walling System
Glazing replaced to dateApproximately 748m²
Building typeAir-conditioned commercial office accommodation

Improved aesthetics

A cleaner, more consistent glazed facade replaces old, damaged and inconsistently filmed units.

Better working environment

Reduced solar gain and cleaner internal views support a more comfortable office setting.

Reduced energy costs

Improved U-value and lower g-value reduce heating and cooling demand.

Project overview

Dortech Maintenance is helping Munroe K upgrade the ABC Building at White Rose Park through specialist replacement glazing. The works retain the existing MAG Presslock Curtain Walling System while improving the building’s aesthetics, internal comfort and energy performance.

The ABC Building at White Rose Park in Leeds had a long-standing glazing performance issue. The building was originally constructed in 1983 for Systime Computers, and many of the insulated glass units had been in place since the original installation.

The challenge

Building users and tenants had experienced a poor working environment, tired and inconsistent external aesthetics, and high energy costs linked to heating and cooling demand.

During warmer months, parts of the building became uncomfortably hot due to solar gain through older glazing. In colder months, weaker thermal performance meant the building became too cold, making heating and air-conditioning systems work harder to maintain comfortable temperatures.

Reflective film had been applied to some existing panes over the years. This created a patchy and dated facade appearance, did not resolve winter heat loss, and did not address ageing, damaged or failing glass units.

Specialist reglazing approach

Dortech worked with Munroe K and Think Architecture Ltd to develop a practical and commercially sensible solution. A key technical constraint was the existing MAG Presslock Curtain Walling System, which incorporated a hard rubber retaining facecap.

The glazing cavity had to be restricted to 12mm to suit the existing system. Dortech developed a specialist reglazing solution, including replacement hard rubber retaining facecaps specially extruded for the MAG Presslock system, so the existing facade could be retained rather than fully replaced.

Glazing specification and performance

Performance measure Existing glazing Replacement glazing Improvement
Light transmission 0.79 / 79% 0.346 / 34.6% Reduced glare and excessive brightness
g-value / solar factor 0.63 / 63% 0.266 / 26.6% Reduced solar heat gain
Centre-pane U-value 2.8 W/m²K 1.3 W/m²K Improved winter insulation

Dortech is replacing the existing units with Guardian SunGuard Silver 35/26 glass units. The reduction in g-value from 0.63 to 0.266 represents approximately 58% less solar energy transmission compared with the original clear units.

Tenant comfort and visual improvement

The upgraded glass addresses comfort issues for tenants and building users while transforming the quality of the internal visual environment. In summer, the lower g-value helps reduce solar heat entering the building. In winter, the improved U-value helps reduce conductive heat loss through the glazing.

Simon Smithson of Think Architecture described the internal visual difference as “literally night and day”.

The new glazing provides a cleaner and clearer appearance from inside the building, replacing ageing, filmed glass with consistent glazing and clearer views.

Indicative energy saving

Saving category Indicative result
Heating-side useful heat reduction Approximately 53,856 kWh per year
Avoided gas input Approximately 63,360 kWh per year
Indicative heating-side saving Approximately £3,269 per year
Avoided cooling electricity demand Approximately 12,517 to 33,797 kWh per year
Indicative cooling energy saving Approximately £2,777 to £7,499 per year
These figures are indicative and depend on orientation, occupancy, HVAC controls, internal gains, weather, shading and how the building is operated.

Conclusion

The ABC Building at White Rose Park demonstrates how targeted reglazing can solve multiple issues at once: improving aesthetics, improving the working environment, and reducing energy demand.

By understanding the constraints of the existing curtain walling system and retaining the facade, Dortech was able to offer a lower-disruption and commercially valuable route to improved building performance.

Calculation assumptions

Assumption Value
Glazing area replaced to date 748m²
Existing glass light transmission 0.79 / 79%
Replacement glass light transmission 0.346 / 34.6%
Existing glass g-value 0.63 / 63%
Replacement glass g-value 0.266 / 26.6%
g-value reduction 0.364
Existing centre-pane U-value 2.8 W/m²K
Replacement centre-pane U-value 1.3 W/m²K
U-value improvement 1.5 W/m²K
Heating degree days 2,000 K-days/year
Assumed heating efficiency 85%
Assumed gas rate 5.16p/kWh
Assumed electricity rate 22.19p/kWh

Disclaimer: This case study is provided for general guidance. Performance data and energy savings are indicative only and should not be relied upon as guaranteed performance, EPC outcome or financial return.